Monday, January 19, 2009

Work is moving on at the "D"s project

So the red metal roof is on and the guys are back doing the log siding on the dormers along with putting windows. They also

Even the family gets into the act Ana Dad is helping with the fan box.

Here is what the back side of the home looks like....big Shed dormer so there is a ton of room upstairs in loft, master bedroom, bath and closest. And yes they are on top of a daylight basement that is much needed extra space.

This is a close up picture of the finished concrete floor. They did radiant heating using hot water tubes and then poured colored concrete over it and then came back and stamped in a pattern with some more stain so it give the floor depth in the color along with texture and the bonus is warmth also.

This is looking down from the loft into the Living room. You can also see the doors and windows are here and getting put in at this time.

This is taken from the dining room area to the front door and stairs to second floor.

This is to show you that they left the kids bedroom floor flat so they could do carpet over the concrete if they wanted to.

This is in the kitchen area and they blocked out for the Island that has a stove and oven in it.

They have a very busy week ahead and then they are moving onto insulation and sheetrock : )

2 comments:

Shelley said...

I really like this home! My next log home will have radiant floor heating!

Jen said...

Great progress going on here.
I really! like the red roof. I think they will enjoy having a walk out basement, especially with kids. We have a mud room, so I can't complain too much.

Your header picture is pretty!